Title: Современные представления несущей способности забивных свай (по результатам погружения и работе, свай в грунте)
Other Titles: Modern ideas of bearing capacity of driven piles (based on immersion and work piles in the ground)
Authors: Моторный, Антон Николаевич
Motornyi, Anton
Моторный, Николай Антонович
Motornyi, Mykola
Keywords: bearing capacity of the pile
compacted core
the impact energy of the hammer
between pile space
denial piles
precast pile
межсвайное пространство
несущая способность сваи
энергия удара молота
уплотненное ядро
забивная свая
отказ сваи
Issue Date: Aug-2014
Publisher: ДВНЗ «Придніпровська державна академія будівництва та архітектури»
Citation: Моторный А. Н. Современные представления несущей способности забивных свай (по результатам погружения и работе, свай в грунте) / А. Н. Моторный, Н. А. Моторный // Вісник Придніпровської державної академії будівництва та архітектури. – 2014 – № 8. – С. 32-42
Abstract: RU: Рассматривается вопрос формирования отказа забивной сваи. Делается предположение что отказ сваи — это деформация слоя грунта расположенного под формирующимся уплотненным ядром от сплошной мгновенной нагрузки, передаваемой через подошву уплотненного ядра от удара молота по голове сваи. Дается предложение определения отказа сваи по условию энергетического равновесия — формирования энергии удара молота и ее израсходование на погружение сваи.
EN: The issue of the formation of denial of driven piles is discussed. It is assumed that the pile denial is the deformation of the soil layer located below the forming firm zone under the continuous instantaneous load transmitted through the soles of the firm cores from the blow of the hammer on the head of the pile. Propose to define the pile denial under the condition of energy balance — the formation energy of the hammer blow, and its expenditure on the submerged piles. It is given the ground for the formation of the optimal distances between the axes of the piles in the bunch and a pile field. It is specified the while crossing compacted zones overcrowded ground moves in the slit formed around the pile shaft, which eliminates the transmission of pressure on the side surface of the pile shaft and prevents movement of adjacent piles. It is given the ground for the formation of loosening soil in between pile uneven deformation loosening soil, the formation of holes and breaking the contact between the sole of the grillage and the foundation that violates their common work and does not allow to relieve piles under the load due to the inclusion of the pile grillage of the pile foundation in common work with the foundation.
URI: http://srd.pgasa.dp.ua:8080/xmlui/handle/123456789/11590
Other Identifiers: http://visnyk.pgasa.dp.ua/article/view/41988
Appears in Collections:№ 08

Files in This Item:
File Description SizeFormat 
Motornyi.pdf908,68 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.